Skip to the job sheet

Demo site by Tempany Web Studios This is an example website, not a real business. tempanywebstudios.co.uk

Measured twice. Built once. Finished properly.

Quoted

0

working days

Built

0

working days

What you pay

working days, quoted and invoiced

Measured elevation drawing of a fitted kitchen run A technical line drawing: two wall units either side of an extractor hood, a solid oak worktop over three runs of base units, a sink cut out of the worktop, and dimension lines reading 4 200 mm across, 900 high to the worktop and 720 to the wall units. 4 200 mm 900 720 40mm solid oak worktop

Fig. 01 · Quoted

Kitchen elevation

Dollar · 4 200 mm run · scale 1:20

Drawn before a single unit is ordered, and priced off the drawing.

The same kitchen elevation, before it was built The identical setting-out drawing, shown underneath the finished kitchen so the two can be compared. 4 200 mm 900 720 40mm solid oak worktop
The same kitchen as built The finished run: painted shaker wall units either side of a stainless extractor hood, a forty millimetre solid oak worktop with a ceramic sink, three runs of painted base units with bar handles, and an oak floor.

Built · Invoiced

Shaker kitchen & island

Dollar · 9 days on site · supply & fit

Handed over on the ninth day, at the figure on the quote.

The quote

Six things we do, and what they cost before we start

We are a small team by choice: Ewan on site every day, two joiners, and the same electrician, plumber and plasterer we have used for years. One point of contact, and no sub-contractor roulette.

The invoice

Every figure on this side goes on the written quote, broken down by stage, with materials named by manufacturer. It is the same figure that comes back on the invoice, unless you change the scope in writing.

Quotes are free within thirty miles of Dollar.

  1. 01

    Fitted kitchens

    Full supply and fit, or fitting a kitchen you have bought yourself. Units scribed to the wall, worktops joined on site, appliances tested and the old kitchen taken away.

    Fitting only
    from £2,650
    Supply & fit
    from £9,500
  2. 02

    Extensions

    Single-storey rear and side extensions from foundations to final coat. We manage the trades, the inspections and the mess, and keep the rest of your house liveable while we work.

    Per square metre
    from roughly £2,400
    Typical 20m² build
    £48k–£62k
  3. 03

    Loft conversions

    Rooflight and dormer conversions, including the structural steel, the staircase and the warrant drawings. Most of the older Hillfoots houses have more room up there than owners expect.

    Rooflight
    from £28,000
    Dormer
    from £42,000
  4. 04

    Bespoke joinery

    Made in our Dollar workshop: alcove units, window seats, boot rooms, panelling, hardwood staircases and anything a flat-pack will never fit. Drawn, priced and fitted by the same hands.

    Alcove units
    from £980
    Hardwood stair
    from £4,200
  5. 05

    Doors and ironmongery

    Internal doors hung and eased properly, so they still shut in August. Hardwood and composite front doors supplied and fitted, with multi-point locks and draught sealing.

    Internal door
    from £145 each
    Front door
    from £1,650
  6. 06

    Flooring

    Engineered and solid timber floors, herringbone and chevron patterns, plus levelling, sub-floor repairs, skirtings and beading. Acclimatised on site before a board is laid.

    Engineered oak
    from £32 per m²
    Herringbone
    from £48 per m²

The drawings

A year on site, in drawings

Every job starts as a drawing before it becomes a skip in the driveway. Six recent projects, shown as the setting-out drawings we actually worked from.

The invoices

22 years on the tools, 480+ jobs completed, and 94% of the work now comes from repeat clients and word of mouth. 10 years on the workmanship, in writing.

Watch the two figures on the rule. One is what we said the job would take. The other is what we billed for. They have never come apart.

The six jobs below total 148 working days on site. The quoted total and the invoiced total are both 148.

  1. 4 300

    Shaker kitchen & island

    Wall taken back to stone, units scribed to a floor that dropped 40mm across the room, and a 3.6m oak worktop joined in situ.

    Where
    Dollar
    Days on site
    9
    Scope
    Supply & fit
    Invoiced
    At the quote
  2. 13 risers @ 192

    Oak staircase & balustrade

    A 1970s open-tread stair replaced with a closed-string oak flight, cut and finished in the workshop before it came near the house.

    Where
    Bridge of Allan
    Days on site
    6
    Scope
    Workshop-made
    Invoiced
    At the quote
  3. 8 400 span

    Dormer loft conversion

    Two bedrooms and a shower room formed in a 1930s semi, with steels craned in over the back garden.

    Where
    Tillicoultry
    On the job sheet
    11 weeks
    Days on site
    55
    Scope
    Warrant approved
    Invoiced
    At the quote
  4. 838 × 1981

    Bespoke entrance door

    Made to fit an out-of-square stone opening, in Accoya and painted, with a multi-point lock and a full draught seal.

    Where
    Alva
    Days on site
    3
    Scope
    Accoya, painted
    Invoiced
    At the quote
  5. 36 m² laid

    Herringbone oak floor

    Sub-floor levelled and set out from the centre line of the bay, so the pattern runs true into every doorway.

    Where
    Larbert
    Days on site
    5
    Scope
    Engineered oak
    Invoiced
    At the quote
  6. 6 200 × 4 000

    Rear extension & open-plan kitchen

    A flat-roof extension with a 2.4m rooflight and four-panel bi-folds, tied into the existing kitchen so the whole ground floor works as one room.

    Where
    Denny
    On the job sheet
    14 weeks
    Days on site
    70
    Scope
    25m² footprint
    Invoiced
    At the quote

The programme

No surprises, start to snagging

Most complaints about builders come down to the same three things: vague prices, silent phones and an unfinished last job. Here is exactly how a job with us runs.

The timing

You get a named contact, Ewan, for the whole job. Calls and emails are answered within one working day, dust screens go up, floors get protected and the site is swept every evening.

  1. Step 01

    Site visit and measure

    A proper hour on site, usually within a week of you getting in touch. We measure, take levels, look under the floor and tell you honestly what the job needs.

    Free · evenings available

    Nothing is charged for and nothing is committed to. If it is not a job for us we will say so on the day.

  2. Step 02

    Drawings and fixed quote

    A written quote broken down by stage, with materials specified by name, plus setting-out drawings for kitchens and joinery so you can see the job before it is built.

    Within 5 working days

    Fixed price, written down. We do not work on day rates for planned jobs, so comparing us with someone else is comparing like for like.

  3. Step 03

    Warrants and programme

    Where a building warrant is needed we prepare and submit the application, then give you a dated programme showing what happens in which week.

    Typically 8–12 weeks for approval

    That wait is the council's, not ours. It is the main reason extensions and lofts book three to four months out.

  4. Step 04

    On the tools

    We start when we said we would and work 7.30am to 5pm. You get a short update at the end of each week, and a call before anything changes.

    One job at a time

    There is no second site pulling the joiners away on a Tuesday, because we do not take one on.

  5. Step 05

    Snagging, sign-off and guarantee

    We walk the job with you and write the snag list ourselves. Everything on it is cleared before the final invoice is issued, not after. Ten years on the workmanship, in writing, with the manufacturer paperwork for everything we installed.

    10-year written guarantee

    Doors ease and timber moves. Ring us and we come back, and we do not charge for it.

We finish the job before we start the next one.

Promise four of five

The price on the quoteis the price on the invoice.

148 days on site. Not one invoice above its quote.

Six jobs, one figure. If the scope changes you will hear the new number before the work happens, in writing, and you can say no to it.

Request a fixed quote

Get a price

Tell us about the job

Fill this in and we come back within one working day with either a price bracket or a date to come and measure. The more you tell us, the more useful the first reply is.

Demonstration form. This is an example website. Nothing is sent anywhere and no detail leaves your browser.

We reply to every enquiry, usually the same day. We will not pass your details to anyone else, and we do not add anybody to a mailing list for asking about a kitchen.

Before you send it

How far ahead are you booking?

Kitchens and joinery are currently going in six to eight weeks ahead. Extensions and loft conversions need three to four months, mostly because of warrant approval rather than our diary. Small repair work we can often slot in within a fortnight.

Do I need a building warrant?

Almost all extensions, loft conversions and structural alterations do, and so does anything that changes a load-bearing wall. Straight kitchen replacements and joinery usually do not.

We will tell you at the site visit, and if a warrant is needed we prepare the drawings and submit the application to your local authority on your behalf.

How do you price a job?

Fixed price, written down, broken into stages. We do not work on day rates for planned jobs. The quote lists the materials by manufacturer and specification, so if you compare us against someone else you are comparing like for like. Quotes are free within thirty miles of Dollar.

Do you want a deposit up front?

We never ask for money for labour before we start. On larger jobs there is a materials payment once the order is placed, for kitchen units, steels or windows, and then staged payments as each stage completes. Final payment is due after the snag list is signed off, not before.

Can I stay in the house while you work?

In nearly every case, yes. Kitchens usually mean about a week on a temporary sink and a microwave in the dining room, and we will help you set that up. Extensions are worked from the outside for as long as possible, and the wall only comes through near the end.

Are you insured, and what happens if something goes wrong later?

£5m public liability and £10m employers' liability. Ask and we email the certificates with the quote, along with our waste carrier registration and the guarantee wording.

Our workmanship guarantee runs for ten years and it is a real document, not a line on a website. Timber moves and doors need easing after a winter. That is normal, and we do not charge to come back and sort it.

Clackmannanshire

Dollar, Alloa, Tillicoultry, Alva, Menstrie, Sauchie, Clackmannan, Coalsnaughton, Muckhart

Stirling

Stirling, Bridge of Allan, Dunblane, Causewayhead, Cambusbarron, Doune, Callander, Bannockburn, Cowie

Falkirk

Falkirk, Larbert, Stenhousemuir, Denny, Bonnybridge, Polmont, Grangemouth, Camelon, Airth

Whinstone Joinery & Building, Unit 4, Burnside Workshops, Muir Road, Dollar FK14 7NL. 01632 960118. Owner-run since 2004, fully insured, guarantee in writing, one job at a time.

This is a demonstration site built by Tempany Web Studios. The firm, the people, the workshop address and the phone numbers are invented. Nothing sent from this page reaches anybody. Every drawing on it was drawn by hand for this build.

Privacy policy · Terms and conditions · Cookie settings